Back to Case Studies
Egham

Project Details

The existing trim trail was not suitable for the younger children at this school and was laid on tarmac. We removed the old equipment and installed low level equipment suitable for the age range and used a bright two tone wetpour surfacing.

Budget

£
13000
Top